top of page
CIVIL PROJECTS
Neptune Bulk Terminals Bridge Expansion
This project included the construction and placement of a prefabricated bridge deck onto a cast in place concrete substructure. Lev-Son was contracted to provide services as Junior Site Superintendant and Substructure Foreperson.
column formwork
Deck overhang formwork
Pier Formwork
column formwork
1/3
Trans-Canada Highway Expansion Phase 1
The first phase of the ongoing expansion of the famous Trans-Canada Highway. Lev-Son was contracted as the concrete formwork superintendent and provided skilled labour, materials and equipment to construct a four-lane overpass, several animal crossings and box culverts, multiplate culvert headwalls, a fish crossing, and a bostock retaining wall.
Bolt casting
Wall forming
Deck forming
Bolt casting
1/7
bottom of page